Rooftop Solar
DC Office
Office of the District Commissioner, Sirajganj
PCPL delivered a landmark 150 kWp rooftop solar installation across the three administrative blocks of the Sirajganj District Commissioner's Office —achieving one of the fastest government commissioning timelines in the division. Designed to drastically reduce grid dependency for a critical public institution, the system generates an expected 191 MWh of clean energy annually, translating directly into significant cost savings for the government and measurable carbon reductions. From the awarded contract to full commissioning in under 30 days in June 2026, this project stands as a testament to PCPL's unmatched project execution capability. The installation seamlessly integrates with the existing high-tension electrical infrastructure of the DC office, utilizing advanced grid-tied inverter technology to maximize solar yield during peak administrative hours. Operating continuously through harsh weather, this deployment emphasizes the government's commitment to migrating critical administrative hubs to sustainable, decentralized power architectures without disrupting daily civil services.
DC Capacity
150 kWp
AC Output
120 kW
Targeted Yearly Generation
191 MWh
Commissioned
June 2026